Transforming a Logistics Space with High-Resistance Modules
How Mersin House solved the challenges of a coastal distribution center with innovative modular solutions.
Javier López
Operations Director, LogiCostas S.A.
Project completed in November 2023
Modular installation for a distribution center. Reference image.
Our company urgently needed to expand storage capacity in a port area with extreme environmental conditions: high salinity, strong winds, and space limitations. Traditional construction was not viable due to time and cost.
Mersin House's Approach
The Mersin House team didn't just present us with a catalog of modules. They conducted a comprehensive material resistance analysis specific to our location, proposing special alloys and surface treatments to combat corrosion. Their scalable modular infrastructure plan allowed us to grow in phases without halting operations.
Time Reduction
Installation was completed in 60% less time than estimated for a conventional project.
Maintenance Savings
The selected materials have reduced projected maintenance costs by 40%.
Result and Added Value
Beyond delivering a structure, they provided us with a logistics urban planning model for the area, optimizing flows and future expansions. The applied modular architecture demonstrated a flexibility we did not anticipate, allowing us to reconfigure internal spaces according to cargo seasonality.
"The collaboration with Mersin House transformed an operational problem into a competitive advantage. Their mastery of civil engineering in complex environments is exceptional."